The Adair and Hazelwood Towers project in West London delivered a full recladding and upgrade programme to improve fire safety, efficiency, and compliance with modern regulations.
The Adair and Hazelwood Towers project in West London was a large-scale recladding scheme designed to improve fire safety, thermal performance, and long-term durability. The works involved the complete replacement of the external façade, along with essential structural upgrades and the installation of modern safety systems.
This comprehensive refurbishment was carried out to bring the towers in line with the latest building regulations, while also meeting strict resident safety requirements.

Our Role and Services
• Delivered a comprehensive façade recladding and refurbishment package, including:
• Removal of existing cladding.
• Installation of a new A1-rated terracotta tile rainscreen system with mineral wool insulation.
• Replacement of all external windows and balcony doors.
• Roof replacement works at Hazelwood Tower.
• Balcony upgrades, repairs, and safety improvements.
• Fire safety works including smoke vent installation and fire-stopping.
• Structural and enabling works such as concrete/brick repairs, external M&E works, and lightning protection.
Materials and Technologies Used
• Clay terracotta tiles – forming the external A1-rated rainscreen cladding.
• Mineral wool insulation – non-combustible and high-performing.
• Sub-frame support system – to securely fix the rainscreen cladding to the tower structure.
• Modern replacement windows – designed for energy efficiency, security, and durability.
• Balcony doors and treatments – pigeon netting, new finishes, and safety upgrades.
• Roof replacement system – ensuring long-term weather protection.
• Smoke vent system – installed for improved fire safety and smoke extraction.
• Fire-stopping and fire-rated materials – integrated with façade penetrations and M&E systems.
Challenges and Solutions
• Occupied buildings: works carried out while residents remained in situ.
• Solution: carefully phased programme and strict safety measures to minimise disruption.
• Complex fire safety requirements: needed integration of new systems with existing structure.
• Solution: close collaboration with fire engineers and M&E specialists.
• Façade removal and replacement: ensuring safe dismantling of existing cladding.
• Solution: methodical sequencing and robust waste management.
• Urban location: restricted access for deliveries and material storage.
• Solution: coordinated logistics and just-in-time deliveries.
Results and Benefits for the Client
• Complete façade transformation with a modern terracotta rainscreen system.
• Achieved A1 fire safety compliance, significantly improving resident safety.
• Enhanced thermal and acoustic performance of the towers.
• Extended the building’s lifespan with robust structural and weatherproofing works.
• Delivered a high-quality installation within the 44-week programme.
• Provided residents with improved comfort, security, and peace of mind.
TESTIMONIALS
‘’I confirm that I have dealt with Mardani Glazing Ltd since 2007, during which time they have provided John Sisk & Son Lid with excellent support... Their work has been a major factor in our completion of successful projects, on a programme with a high standard of quality. I can confidently recommend Mardani Glazing Limited as a solid and reliable installer, and experts in their field.’’
Mardani Facades has successfully completed many projects for FAA over the past 10 years, always delivering to high standards with great attention to detail. We have built a strong working relationship with Dan Maries... Key completed projects include Farnborough Business Park, The Bower, Cornerstone, Kensington Row, and Westminster City Hall.
‘’To Whom It May Concern, Daniel is an excellent Man manager and his technical skills are very competent. He has shown that he can cope with pressure and programme requirements, whilst maintaining quality and with no compromise to Health and Safety. I would recommend Daniel and certainly choose to work with him again on future projects.’’