Block F-Kensington

Kensington Row - Block F is a prestigious West London development, featuring high-quality new build homes with premium finishes and a durable, striking façade that meets strict performance standards.

Client Fleetwood Architectural
Value £1.1 Million
Service Residential – New Build
Duration 40 Weeks
Location 4 Mowbray House, 5 Warwick Lane, London W14 8FN
Sector Civic
Block F-Kensington

Project Overview

Kensington Row – Block F is part of a prestigious residential development in West London, designed to deliver high-quality new build homes with premium finishes. The project focused on creating a striking and durable external façade that complements the architectural vision while meeting strict performance standards.

 

Our Role and Services
We were appointed to deliver a complete façade installation package, ensuring precision, performance, and long-term durability. Our scope of works included:
• Installation of Reynaers CW 60 HI curtain walling
• Supply and fitting of Reynaers CS 86 HI and CP 155 HI systems
• Installation of GRC cladding and aluminium cladding
• Fitting of copings and associated façade elements

Materials and Technologies Used
To achieve the desired performance and aesthetics, we utilised:
• SFS systems for structural support
• Reynaers curtain walling and window systems for high insulation and sleek design
• Aluminium cladding for a modern finish and durability
• GRC cladding for lightweight, fire-resistant performance

Challenges and Solutions
• Complex façade geometry: We implemented precision-engineered cladding and curtain wall systems to meet exact architectural requirements.
• Tight programme schedule: Delivered within a 40-week timeframe through efficient project management and phased installation.
• Performance requirements: Ensured compliance with thermal, acoustic, and fire safety standards through the use of advanced Reynaers systems and specialist cladding solutions.

Results and Benefits for the Client
• Delivered a high-performance façade combining thermal efficiency, durability, and aesthetics.
• Achieved on-time completion within the 40-week programme.
• Enhanced the architectural appeal of the development, contributing to its premium residential positioning.
• Provided long-term value through the use of robust, low-maintenance materials and technologies.

TESTIMONIALS

Clients Review

‘’I confirm that I have dealt with Mardani Glazing Ltd since 2007, during which time they have provided John Sisk & Son Lid with excellent support... Their work has been a major factor in our completion of successful projects, on a programme with a high standard of quality. I can confidently recommend Mardani Glazing Limited as a solid and reliable installer, and experts in their field.’’

Paul Murcy

Senior Engineer

Mardani Facades has successfully completed many projects for FAA over the past 10 years, always delivering to high standards with great attention to detail. We have built a strong working relationship with Dan Maries... Key completed projects include Farnborough Business Park, The Bower, Cornerstone, Kensington Row, and Westminster City Hall.

T S Gosal

Director, Fleetwood Architectural Aluminium Limited

‘’To Whom It May Concern, Daniel is an excellent Man manager and his technical skills are very competent. He has shown that he can cope with pressure and programme requirements, whilst maintaining quality and with no compromise to Health and Safety. I would recommend Daniel and certainly choose to work with him again on future projects.’’

Rod Milicevic

Owner and Founder at LMC Group

Related

Similar Projects