Ibex House in Stratford, East London, underwent a major recladding and façade remediation programme to replace combustible materials, improve fire safety, and enhance overall building performance.
The 70-week project required the removal of unsafe cladding and the installation of a fully non-combustible façade system, whilst preserving the building’s original architectural character. Works were undertaken in a live, occupied residential environment, requiring careful planning to ensure resident safety and minimise disruption.

Our Role & Services Provided
Mardani Façade Ltd was engaged to provide a full cladding remediation service, which included:
• Removal and safe disposal of combustible façade elements.
• Retention and reinstatement of original terracotta cladding to preserve architectural integrity.
• Installation of non-combustible rainscreen cladding, render system, balcony decking, spandrel panels, and fire barriers.
• Programme management and collaboration with the wider project management team to ensure compliance and efficient delivery.
Materials & Technologies Used
• Rockpanel FS-Xtra Rainscreen Cladding – non-combustible and durable.
• SPSenvirowall Render System – enhancing thermal efficiency.
• AliDeck Balcony Decking – safe, non-combustible decking solution.
• Spandrel Panels (Non-Combustible).
• Fire Barrier Systems.
• Terracotta Cladding (Reinstated) – maintaining the building’s original design character.
Challenges & Solutions
The remediation of Ibex House presented several technical and logistical challenges:
• Combustible Façade Materials: Replaced with A1-rated rainscreen, render and spandrel systems.
• Occupied Building: Resident safety ensured through phased works, clear communication, and minimal disruption.
• Constrained Urban Site: Careful site logistics and planning minimised environmental and community impact.
• Architectural Preservation: Terracotta tiles carefully reinstated to respect the original façade design.
• Large-Scale Coordination: Achieved through close collaboration with contractors, consultants, and compliance teams.
Outcomes & Results for the Client
The Ibex House recladding project was successfully completed, delivering significant safety, performance, and social value benefits:
• Fire Safety Compliance: All combustible materials replaced with fully compliant systems.
• Resident Assurance: Safe, comfortable living maintained throughout the works.
• Architectural Integrity: Character preserved through reinstatement of terracotta cladding.
• Improved Energy Performance: Enhanced insulation and render system delivered better efficiency.
• Futureproofed Asset: Longer-lasting building fabric with reduced maintenance requirements.
TESTIMONIALS
‘’I confirm that I have dealt with Mardani Glazing Ltd since 2007, during which time they have provided John Sisk & Son Lid with excellent support... Their work has been a major factor in our completion of successful projects, on a programme with a high standard of quality. I can confidently recommend Mardani Glazing Limited as a solid and reliable installer, and experts in their field.’’
Mardani Facades has successfully completed many projects for FAA over the past 10 years, always delivering to high standards with great attention to detail. We have built a strong working relationship with Dan Maries... Key completed projects include Farnborough Business Park, The Bower, Cornerstone, Kensington Row, and Westminster City Hall.
‘’To Whom It May Concern, Daniel is an excellent Man manager and his technical skills are very competent. He has shown that he can cope with pressure and programme requirements, whilst maintaining quality and with no compromise to Health and Safety. I would recommend Daniel and certainly choose to work with him again on future projects.’’